A 20-story mixed-use office tower is one step closer to rising on a long-vacant lot on East Broadway between Scott and Sixth avenues.
The Rio Nuevo board Tuesday voted unanimously to close the deal for 75 E Broadway, paving the way for the beleaguered project’s approval by the Pima County Board of Supervisors next month.
The $107-million tower was nearly scuttled last year when Kansas City-based JE Dunn backed out. Local developers Peach Properties and Marcel Dabdoub revived the project in February, aiming to restore the project’s height from a scaled-down 12 stories to the lot’s maximum height of 20 — making the tower Tucson’s second tallest.
Rio Nuevo board chair Fletcher McCusker said the tower represents a victory amid the economic turmoil of the Covid-19 pandemic.
“We’re moving to close on the largest project we’ve ever been involved with at a time when clearly the betting money was this would’ve folded,” he said. “It literally, no pun intended, is a phoenix rising out of a lot of ashes that got worse with Covid-19.”
The project will include two floors of retail, six floors of parking, six floors of office space and six floors of residential — and a rooftop pool. McCusker said the 30,000 square foot retail space at the street level will be among downtown’s largest and could attract a grocery store to serve downtown Tucson’s growing population.
“This building will be around for our lifetimes. This is a massive victory in the midst of a pandemic,” said Rio Nuevo board member Edmund Marquez. “This is a local developer who put together a deal which JD Dunn didn’t or couldn’t get done.”
No tenants are currently announced. The project’s financiers aren’t requiring the project to be pre-leased. Previously, JE Dunn’s lenders were requiring the project to be 50% leased before construction began, which McCusker said is likely what helped kill that company’s proposal.
“They were trying to market an invisible building in a town not known for its class A market space,” he said.
The project would be downtown Tucson’s first mixed-use high rise in over three decades. The most recent was Tucson’s tallest building, One South Church, in 1985. That tower is undergoing a Rio Nuevo-back conversion of its lower eight floors into a hotel.
Rio Nuevo has spent over $340,000 in upfront costs associated with the site. The economic development district currently leases the lot from Pima County for $189,000 a year, and plans to purchase the property for its appraised value of $2.7 million when construction is complete in 2022.
McCusker said construction could begin before the end of the year.
By submitting your comments, you hereby give AZPM the right to post your comments and potentially use them in any other form of media operated by this institution.